Zenner zelsius C5 IUF Manual de usuario

Busca en linea o descarga Manual de usuario para Instrumentos de medición Zenner zelsius C5 IUF. ZENNER zelsius C5 IUF User Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 12
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
zelsius
®
C5-IUF
Installation and
operating manual
Electronic compact heat meter
with ultrasonic flow sensor IUF
optionally M-Bus, wM-Bus and 3 inputs/outputs
optional q
p
0,6/1,5/2,5 m
3
/h
EnergieMetering
All that counts.
Vista de pagina 0
1 2 3 4 5 6 ... 11 12

Indice de contenidos

Pagina 1 - Installation and

zelsius® C5-IUFInstallation and operating manualElectronic compact heat meterwith ultrasonic flow sensor IUF optionally M-Bus, wM-Bus and 3 inputs/out

Pagina 2 - Installation manual

10Important Note:The optical interface has to be activated by means of the OptoHead through keypress before reading out of the de vice.Devices, which

Pagina 3 - * optionally

11LegendPress the button briey (S) to switch through the display from top to bottom. When you have reached the last menu item the device automat

Pagina 4 - Pulse inputs and outputs

12Disposal Attention: This device contains a non-remov-able and non-rechargeable lithium battery. Batteries contain substances, which could harm the e

Pagina 5 - M-Bus (optional)

2Technical data flow sensor IUFNominal flow qp m³/h 0,6 1,5 2,5Maximum flow qs m³/h 1,2 3 5Minimum flow qi l / h 6 / 12 / 24 15 / 30 / 60 25 / 50 / 10

Pagina 6 - Installation instructions

3MID - Initial verificationzelsius® C5-IUF is produced and tested in compliance with the new European Measuring Instruments Directive (MID). According

Pagina 7 - Installation DF-adapter

4colourconnection significationwhite I/O 1 In-/Output 1yellow I/O 2 In-/Output 2green I/O 3 In-/Output 3brown GNDcommon ground for I/O 1-3Technical dat

Pagina 8 - Consumer

5A rmly attached cable is included: external wir-ing must be done by oneself.M-Bus (optional)The optional M-Bus interface complies with the norm 1434

Pagina 9 - Status display / Error codes

6Subject to modications and errors excepted. Any liability for misprints excluded. SAP144505_150706_ENInstallation instructionsGeneral InformationRea

Pagina 10 - 1. this month to now

7Notes to installation of the ball valves Mount ball valves up- and downstream of the meter. Mount a ball valve with bore M10x1 for direct sensors

Pagina 11

8Putting into use Open valves carefully and chek installation for leakage. If the sleep mode of the counter is enabled (Display: SLEEP 1), then it

Pagina 12 - Disposal

9Status display / Error codesThe symbols in the table below show the meter’s operational status. The status messages only appear in the main display (

Comentarios a estos manuales

Sin comentarios